Construction Services
Edson BIke Park - Elevated Skills Complex, AB

Building with Sustainability

As the original Bike Park design-build company in the world with nearly 20 years of professional experience in the field, we have extensive knowledge of construction processes, and can mobilize and work on any given project with minimal supervision. Through our commitment and dedication in creating high quality facilities, we follow the best of industry standards to ensure sustainable development in coordination with clients and communities, including but not limited to the duties outlined below.

Mobilization & Site Preparation

Preparing & readying the project site for construction, Hoots Ltd. engages in:

  • Selecting / sourcing of materials & resources
  • Mobilization of tools, equipment & machinery
  • Building, construction & risk management plans
  • Safety signage, traffic & circulation plan
  • Protection / preserving landscape, trees & soil
  • Staging for materials, supplies & equipment
  • Project layout, on-ground alignment & flagging
  • Clearing, brushing & site preparation
  • Rough grade & drainage plan implementation
3 E Mobilization Site Prep collage shot July 24

Construction & Project Administration

From site prep, we continue onto key building & administrative duties involving:

  • Final grading, dirt shaping, compaction & finish
  • Construction / install of technical components
  • Work w/ sub-contractors & specialized personnel
  • Quality assurance & construction administration
  • Site management, reports & documentation
  • Test riding, evaluation & addressing of any issues
  • Adherence to best practices & safety standards
  • Preparing As-Built Plans & Maintenance Manual
  • Signage program & implementation
3 E 2021 Aug10 Hinton Dread Flow Trail bld Stirling Hoots Inc fb

Hinton Bike Park, AB - Dread Flow Trail

Sustainable Construction & Maintenance

We build with responsible development practices from a management and maintenance perspective – monitoring and addressing any negative site impacts, expertly handling drainage, minimizing erosion, and employing protection / preservation strategies for the landscape and sensitive areas. Alongside, we strive to integrate with the existing terrain, drawing on local site materials / resources and skillfully shaping features to blend with the setting and environment. From project completion, we provide an in-depth Maintenance Manual for regular facility upkeep and follow-up maintenance services to ensure proper tune-up and design performance, as well as offering training & education services to encourage sustainability and ongoing care.

3 E 202 X Edson Start Return with geotech IMG 9339 1

Edson Bike Park, AB - Start / Return Hill

Leader in Bike Facility Development & Construction